Concrete Pile Crushing removes the top of cast piles down to the cut-off level, leaving the reinforcement exposed for the pile cap. Use Demolitions South Africa to send one request and pile head removal contractors can reply with prices.
Describe your job once to get concrete pile crushing quotes.
Get Pile Crushing QuotesWhat Concrete Pile Crushing Includes
- Marking of the cut-off level.
- Hydraulic pile crushing or controlled breaking.
- Protection of the pile below the cut-off.
- Exposing and straightening starter bars.
- Removal of broken concrete.
Projects Covered
- Bored and auger piles.
- Driven precast piles.
- Piles for buildings, bridges and towers.
- Small and large pile groups.
- Piled foundations on commercial and industrial sites.
Scope Options and Exclusions
Scope options
- Hydraulic crusher mounted on an excavator.
- Hand-held breaking for small numbers.
- Crushing with disposal.
- Crushing only, with rubble left for the main contractor.
Usually excluded
- Pile integrity testing, unless quoted.
- Pile caps and reinforcement, which follow.
- Excavation around piles, unless included.
How It Works
- Assessment. The contractor checks pile sizes, number, cut-off levels and access.
- Quotation. You get a price per pile or per day, with mobilisation.
- Work. Pile heads are crushed or broken to level without damaging the pile below.
- Clearance. Broken concrete is removed and bars left ready for the cap.
Requests are accepted from all nine provinces. Matching depends on the service and on local contractor availability, so the number of replies can vary.
Concrete Pile Crushing Prices
Prices JUST UPDATED. Indicative ballpark ranges, excluding VAT. Your quote depends on the site.
| Work | Ballpark price (excl. VAT) |
|---|---|
| Pile head, 300 to 600 mm diameter | R450 to R1,500 per pile |
| Hydraulic pile crusher with operator | R8,000 to R18,000 per day |
| Mobilisation | R3,000 to R12,000 |
| Concrete disposal | R300 to R600 per m³ |
What Affects the Price
- Pile diameter and number.
- Height above cut-off.
- Concrete strength and reinforcement.
- Access and excavation.
- Mobilisation distance.
- VAT.
What to Include in Your Request
- Site location.
- Number and diameter of piles.
- Height to be removed.
- Pile layout drawing.
- Access and excavation status.
- Programme.
Related Services and Guides
Frequently Asked Questions
Why crush rather than break?
A crusher removes the head with less risk of cracking the pile below the cut-off.
Is it noisy?
Hydraulic crushing is usually quieter and causes less vibration than breaking.
Who sets the cut-off level?
The engineer and main contractor. The pile contractor follows the marked level.
Is there a minimum charge?
Usually, due to mobilisation. Grouping piles into one visit lowers the cost per pile.
Are the bars bent back afterwards?
Starter bars are exposed and left as specified for the pile cap.
Describe your job once and get the best quote, fast.
Get Pile Crushing QuotesGet the Best Quote, Fast
Keep it brief. Give your location, the service, the approximate size and a short description. With your consent, your enquiry is passed only to independent contractors suited to the job, and you decide whether to go ahead.
Client Reviews
Powered by leaderr